Interested in a career where you can make a difference? | Click here to view our open positions.

City of San Marcos Sunset Acres Engineering & Design

CLIENT NAME

City of San Marcos

LOCATION

San Marcos, Texas
United States


PRACTICE AREA

Stormwater & Flood Management

SERVICES INCLUDED

Stormwater

Drainage

Flood Management

Project Gallery

Images
No items found.

Historically, the Sunset Acres neighborhood has had flooding issues due to an undersized storm sewer system. The primary objective of this project was to alleviate drainage issues in the most cost-effective manner. A secondary objective was to reroute/replace utility lines and provide traffic calming measures through the neighborhood. Plummer was responsible for the design of utility reroutes and for determining locations and sizing of gutters, storm water inlets, and channels to convey the 25-year, 24-hour storm event.

Similar PROJECTS

City of Austin Lady Bird / East 4th Street Drainage Improvements

This project included the evaluation of secondary streets, inlets, and pipe flooding conditions located in an older section of East Austin.

City of Dallas Pavaho Stormwater Treatment Wetlands & Green Infrastructure

The City of Dallas was required to provide funding for design and construction of a Supplemental Environmental Project (SEP) known as the Pavaho Wetland.

No items found.

Work With Us

We design solutions to the world's greatest challenges. We're ready to take on any problems you may run into.