Port of Corpus Christi Authority
Corpus Christi, Texas
United States
Stormwater Master Plan
Flood Mitigation
Green Infrastructure
The Port of Corpus Christi Authority (PCCA) commissioned Plummer to develop a Storm Water Master Plan for the Inner Harbor Industrial Area, which comprises more than 5,000 acres. The purpose of the master plan is to develop prioritized grey and green infrastructure projects to improve the flood mitigation and water quality of the Inner Harbor. Plummer has obtained LiDAR topographic and aerial imagery (UAV), has performed field assessment of current infrastructure condition and will develop hydrologic, hydraulic and water quality models for the project area to determine potential projects.
This project included the evaluation of secondary streets, inlets, and pipe flooding conditions located in an older section of East Austin.
The City of Dallas was required to provide funding for design and construction of a Supplemental Environmental Project (SEP) known as the Pavaho Wetland.
We design solutions to the world's greatest challenges. We're ready to take on any problems you may run into.