This project included a half mile major realignment and reconstruction of street in a large city in Texas.

Work included the coordination of every major utility including steam, chilled water, water, wastewater, storm drains, telecommunications (5+) and underground electric.

Plummer served as a liaison between the engineering groups of a major telecommunications provider, construction crews, and various interested parties. The role included negotiating a joint-design and joint build-operate agreements between the provider and the city.  This was the first of its kind for the region and a major achievement in a short time frame.  The agreement included the provider’s fiber network feed for the convention center and sports dome.  Construction cost was estimated to be $500K utilizing directional bore and open trench technologies.  Work also involved balancing the needs and schedules of multiple interested parties while working within a very short timeline.

Similar PROJECTS

Fiber FTTX Build

Plummer assisted the Zayo Group in their recent deployments of Fiber to approximately 100 cell towers within the Austin and San Antonio Market areas.

Aerial to Underground Conversion Cost Study for Major Telecom Provider

Plummer assisted a major telecom provider with developing an Aerial to Underground Conversion Cost Study for approximately one mile of dense urban facilities.