The South Wastewater Treatment Plant membrane bioreactor (MBR) facility, adjacent to the Post Oak Creek Wastewater Treatment Plant on a greenfield site, includes 30-inch to 54-inch-diameter collection system pipelines; influent screening and pumping; preliminary treatment including grit removal and fine (1 mm) screening; a 4-MGD flow equalization basin; activated sludge biological treatment including anoxic and aerobic treatment; membrane bioreactor basins; a support building with control room, offices, restrooms, storage, and an electrical room; return and waste activated sludge pumping; electrical and control systems; backup generators; and a sludge storage tank. Improvements to the Post Oak Creek WWTP include a new relift pump station and new tertiary cloth filtration. Significant challenges for the project arose due to the industrial user needs and schedule. The City selected a Construction Management at Risk delivery method to bring the contractor on board early and allow construction to proceed while design continued to progress. Procurement of long-lead items began even before the contractor was engaged, and the Plummer team structured the design sequence to facilitate construction.
Plummer is currently serving in a third-party construction management and inspection role for the Sabine Creek Wastewater Treatment Plant expansion.
Plummer is providing construction observation services for 35 miles of 66-inch steel raw water pipeline.
As a result of Tinker Air Force Base expanding eastward and closing public road access, the existing 60-inch potable water transmission main needs to be relocated.
The South County Advanced Wastewater Treatment Facility (SCAWWTF) is critical to serving the rapidly growing population in southern Hillsborough County.
We design solutions to the world's greatest challenges. We're ready to take on any problems you may run into.