Plummer is currently serving in a third-party construction management and inspection role for the Sabine Creek Wastewater Treatment Plant expansion.
Plummer is providing construction observation services for 35 miles of 66-inch steel raw water pipeline.
The water treatment plant expansion from 4 MGD to 6 MGD includes a new raw water pump station, conveyance piping, and an Actiflo pretreatment system.
The South County Advanced Wastewater Treatment Facility (SCAWWTF) is critical to serving the rapidly growing population in southern Hillsborough County.
The South Wastewater Treatment Plant is a membrane bioreactor (MBR) facility, adjacent to the Post Oak Creek Wastewater Treatment Plant on a greenfield site.
As a result of Tinker Air Force Base expanding eastward and closing public road access, the existing 60-inch potable water transmission main needs to be relocated.
We design solutions to the world's greatest challenges. We're ready to take on any problems you may run into.